The James E. Clyburn Research Center
| Project Costs |
| |
Drug Discovery Building |
$ 61.5 million |
| |
Bioengineering Building |
$ 58.3 million |
| |
Total |
$119.8 million |
| Total Square Footage |
| |
Drug Discovery Building |
114,539.7 total gross sf |
| |
Bioengineering Building: |
96,941.3 total gross sf |
| |
Total |
211,481.0 total gross sf |
| |
|
|
| Architect |
Stevens & Wilkinson of South Carolina, Columbia, SC |
| Associate Architect |
Goody Clancy, Boston, MA |
| Engineer |
Stevens & Wilkinson of South Carolina, Columbia, SC |
| Lab Planner |
SST Planners, Arlington, VA |
| Landscape Architect |
Urban Edge Studio, Mt. Pleasant, SC |
| Contractor |
Brasfield & Gorrie, Atlanta, GA |
| |
|
|
| Bioengineering Building |
| Initial space assignments, floor by floor |
| 1st Floor |
College of Graduate Studies |
| |
South Carolina Bioengineering Alliance |
| |
Foundation for Research Development |
| |
Hollings Cancer Center
Cancer Prevention & Control
Cancer Disparities |
| |
171-seat conference center * |
| |
70-seat classroom* |
| |
Bioengineering machine shop |
| |
|
| 2nd Floor |
Center for Biomedical Imaging |
| |
Clemson-MUSC Biomedical Engineering Program |
| |
Neurosciences Research Laboratory |
| |
SmartState Center of Economic Excellence for Brain Imaging |
| |
|
|
| 3rd Floor |
Clemson-MUSC Orthopedic Engineering |
| |
Clemson-MUSC Biomedical Engineering Program |
| |
SmartState Center of Economic Excellence in Regenerative Medicine |
| |
|
| 4th Floor |
Hollings Cancer Center Research Laboratories |
| |
Biorepository |
| |
Cancer Genomics Program |
| |
|
|
| *These rooms provide Ethernet and power connections for each seat in addition to a wide array of other audio visual and video conferencing capabilities. |